Most people want you be a part of all of our really efficient hottest PASSLEADER C_TPLM30_66 Serious Checks plus absolutely free examine serious problems the answers which will help you seriously around C_TPLM30_66 Publications examine groundwork. When you are hankering very difficult for any hottest plus most well liked cert groundwork publications in that case continually bring enable out of C_TPLM30_66 exam pdf demo hottest acoustic direct plus C_TPLM30_66 VCE hottest interactive audit website plus go away around initially consider. Very without difficulty go away C_TPLM30_66 EXAMINE around 1 week with groundwork bring superb enable with internet C_TPLM30_66 interactive evaluating website.

QUESTION 1
When the user creates a maintenance plan for a call object (order), which value in the planning data determines the order type?

A. Priority
B. Maintenance activity type
C. Maintenance planner group
D. Main work center

Answer: C

QUESTION 2
A maintenance technician replaces a defective counter with a new counter. Before the users can create a standard measuring document for the new counter, what step(s) must they perform?

A. Create a new technical object to represent the new measuring point.
B. Create a special measuring document and set the Counter Replacement indicator.
C. Dismantle the old measuring point and create a new measuring point.
D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.

Answer: B

QUESTION 3
A user has planned an operation with labor costs and material costs; however, the material cost element is not assigned to a value category. Where do the material costs appear in the value categories for the order?

A. In the overhead value category
B. In a new, automatically created value category
C. In the unassigned value category
D. In the internal activity value category

Answer: C

QUESTION 4
Which of the following always produces up-to-the-minute costing information for maintenance orders?

A. A standard analysis from the Plant Maintenance Information System (PMIS)
B. A standard query in SAP Net Weaver Business Warehouse
C. A maintenance order list
D. A shift report based on shift notes

Answer: C

QUESTION 5
Which of the following are prerequisites for business completion? (Choose two)

A. The order must have actual costs.
B. The order must be fully settled.
C. The balance of the order must be zero.
D. The order must have planned costs.

Answer: BC

QUESTION 6
What information does the value category provide in the maintenance order?

A. The costs details for individual technical objects
B. The costs by work center
C. The material costs by valuation category
D. A summary of costs for multiple cost elements

Answer: D

QUESTION 7
Which of the following Customizing settings is required to assign a notification to a maintenance order operation?

A. Assignment of operations to all object list entries active
B. Assignment of order type to notification type
C. Maintain indicator for notification data on order header
D. Create default value profiles for general order data

Answer: A